See the train performance figures for our entire network.

We know what being on time means to you, here you can find our punctuality performance figures for the latest rail period and where any delay minutes are attributed. 

 

Period 5 2020:  25 Jul - 21 Aug 2021

Public Performance Measure (PPM)

Shows the percentage of trains which reached their final destination station within 4 minutes 59 seconds of the advertised time

  • Within PPM: 90.1%
  • Outside PPM: 9.9%

 

Right Time

Shows the percentage of trains which reached their final destination station within 59 seconds of the advertised time

  • Within right time: 79.1%
  • Outside right time: 20.9%

 

Proportion of Stations Stops Missed

Shows the percentage of stations which had less than 5% of booked stops missed

  • Within PSSM: 98.2%
  • Outside PSSM: 1.8%

 

Delay Minutes

Shows the percentage of delay minutes attributable to Transport for Wales, Network Rail, and other train operators

  • TfW: 44%
  • Amey: 4%
  • Network Rail: 47%
  • Other train operators: 5%